Our first permanent hunting blind
(which was intended for the 2016-2017 deer season)
we were hoping to complete for the 2017-2018 season.



CONTINUING EVOLUTION of a
PERMANENT WOODEN DEER HUNTING BLIND!
(the inside dimensions will be 8'-by-8' at the base with 8' high at the highest point)
For real... Two guys will be able to comfortably hunt in this blind.


This is the blind as of August 5, 2017: 

...and this was the blind as of March 11, 2017  


We will be using natural cover with nearby trees
which overlook a sloped meadow into a pine grove.


The stairs may be completely re-done, as Tim found something better to try.

We also enlisted an expert carpenter to help us
reinforce the structure and frame the door and windows.

Much later on, it will be painted with various camouflage splotches.

Our blind is loosely modeled on one that is on
  Tim's brother's land near the Georgia border:

 

10:41 a.m. CST March 12, 2016
Blind is 4'-by-8' at base; highest point inside 5'

10:42 a.m. CST March 12, 2016
It is painted neutral grey and has a fold-down window



Resumption of work on the
permanent blind since October 2016:

 

Robert got to meet Tim for the first time.
He brought his excellent carpentry skills to benefit our blind.
One thing about being a photographer–I rarely get into the photos!
Anyway, Tim and I are greatly obliged to Robert for helping us.





8:37 a.m. CST March 11, 2017
First time getting Robert to Alabama!
9:35 a.m. CST March 11, 2017
We all go to the local lumber store.
9:35 a.m. CST March 11, 2017
We get 2"x4"x8's and 2"x4"x10's.
9:37 a.m. CST March 11, 2017
Total bill was north of $170!
10:47 a.m. CST March 11, 2017
Back at the blind with lumber.





10:47 a.m. CST March 11, 2017
Robert was making precise cuts.
11:12 a.m. CST March 11, 2017
Tim drilling in support for front.
11:41 a.m. CST March 11, 2017
Getting vertical supports in wall.
11:45 a.m. CST March 11, 2017
Finished vertical supports for front.
11:49 a.m. CST March 11, 2017
Robert brought his fancy saw.




11:52 a.m. CST March 11, 2017
Having power is very convenient!
12:07 a.m. CST March 11, 2017
Getting horizontal support for window.
1:36 p.m. CST March 11, 2017
Tim levels out vertical support.
1:38 p.m. CST March 11, 2017
Back wall supports coming along.
1:51 p.m. CST March 11, 2017
Finishing edge on vertical support.





1:53 p.m. CST March 11, 2017
All non-door supports installed.
1:53 p.m. CST March 11, 2017
Full view of back supports.
1:54 p.m. CST March 11, 2017
Side view of back supports.
4:19 p.m. CST March 11, 2017
Robert finishing off door frame.
4:35 p.m. CST March 11, 2017
Packing up and going for dinner!
inner Redneck

We continued work on Saturday, April 15, 2017:
inner Redneck

Both the back door frame & window frames were completed.
We have now decided to have to fold-down windows in the front.
Additionally, the original rifle rest from 2016 was completely removed.






8:57 a.m. CDT April 15, 2017
Resuming work after one month
9:02 a.m. CDT April 15, 2017
Support beams for walls prepared
9:02 a.m. CDT April 15, 2017
9:08 a.m. CDT April 15, 2017
9:10 a.m. CDT April 15, 2017
9:25 a.m. CDT April 15, 2017
Top portion of door frame installed
9:25 a.m. CDT April 15, 2017
9:26 a.m. CDT April 15, 2017
9:41 a.m. CDT April 15, 2017
Robert measures along floor
10:11 a.m. CDT April 15, 2017
Tim getting wall support in
10:25 a.m. CDT April 15, 2017
Additional ceiling support is added
10:25 a.m. CDT April 15, 2017
Robert gets this support into place
10:27 a.m. CDT April 15, 2017
Tim puts final screws into support
10:48 a.m. CDT April 15, 2017 11:10 a.m. CDT April 15, 2017
Robert and I just took down rifle rest
11:32 a.m. CDT April 15, 2017
Top part of front window frame
11:32 a.m. CDT April 15, 2017

11:34 a.m. CDT April 15, 2017 11:49 a.m. CDT April 15, 2017
I finally get in the photos!
12:15 p.m. CDT April 15, 2017
We will now have two front windows
12:23 p.m. CDT April 15, 2017
Horizontal window frame portion
2:23 p.m. CDT April 15, 2017
Vertical supports are installed
2:48 p.m. CDT April 15, 2017
Finishing touches applied
3:53 p.m. CDT April 15, 2017
View from front of blind
3:54 p.m. CDT April 15, 2017
Wrapping up for the day


 On Thursday, May 18th,
   Robert assembled our new QUALITY BLIND DOOR...



We continued work on Saturday, May 20, 2017:

We first went by Home Depot in Newnan, Georgia to pick up multiple supplies.
I contributed payment to cover cost of insulation, wafer board, and door hinges.






7:14 a.m. CDT May 20, 2017
truck loaded with door and tools
11:14 a.m. CDT May 20, 2017
beginning work for the day
11:14 a.m. CDT May 20, 2017
we will insulate the walls with this
11:15 a.m. CDT May 20, 2017
Tim clearing path to blind
11:15 a.m. CDT May 20, 2017





11:45 a.m. CDT May 20, 2017
working first wafer sheet
12:07 p.m. CDT May 20, 2017
cut for over top of front windows
12:12 p.m. CDT May 20, 2017
12:27 p.m. CDT May 20, 2017
Tim takes chainsaw to dead tree
12:44 p.m. CDT May 20, 2017
Putting wall over top front




12:46 p.m. CDT May 20, 2017
Inside view around front windows
2:16 p.m. CDT May 20, 2017
Outside view around front windows
2:17 p.m. CDT May 20, 2017
cut for top of back side of blind
2:41 p.m. CDT May 20, 2017
getting top piece installed
2:46 p.m. CDT May 20, 2017
What are YOU lookin' at?





2:46 p.m. CDT May 20, 2017
Duck under unfinished wafer board
3:00 p.m. CDT May 20, 2017
ready for fold-down windows
3:18 p.m. CDT May 20, 2017
Robert attempts shaping of board
3:30 p.m. CDT May 20, 2017
Place insulation inside for next time
3:34 p.m. CDT May 20, 2017
End of day reflecting...


We continued work on Saturday, June 10, 2017:

Today was all about completing coverings on all walls and getting door installed.
Tim took us all late morning to get additional lumber and bulk screws.





9:45 a.m. CDT June 10, 2017
Getting pilot hole started
9:46 a.m. CDT June 10, 2017
Outside view
9:51 a.m. CDT June 10, 2017
Robert feeling rough edge
9:51 a.m. CDT June 10, 2017
Rasping rough part off frame
10:36 a.m. CDT June 10, 2017
Cutting first front piece to size





11:01 a.m. CDT June 10, 2017
Mounting cut wooden piece
11:19 a.m. CDT June 10, 2017
View of panel right side of door
11:19 a.m. CDT June 10, 2017
We need more wafer board!
12:15 p.m. CDT June 10, 2017
Went to get more lumber & supplies
12:49 p.m. CDT June 10, 2017
Bringing back our purchases





12:50 p.m. CDT June 10, 2017
Planning our next move
1:06 p.m. CDT June 10, 2017
1:06 p.m. CDT June 10, 2017
1:13 p.m. CDT June 10, 2017
Getting left panel near completion
1:42 p.m. CDT June 10, 2017
Robert planing edges of door





2:06 p.m. CDT June 10, 2017

2:47 p.m. CDT June 10, 2017
Comparing size of door to frame
2:47 p.m. CDT June 10, 2017

3:06 p.m. CDT June 10, 2017
Robert attaching door hinges
3:10 p.m. CDT June 10, 2017






3:34 p.m. CDT June 10, 2017

3:59 p.m. CDT June 10, 2017

3:59 p.m. CDT June 10, 2017
WE HAVE A DOOR!!!
4:00 p.m. CDT June 10, 2017
Testing door hinges
4:21 p.m. CDT June 10, 2017
Door is nailed shut temporarily


We continued work on Saturday, July 15, 2017:
 
We did, at least, get both side walls lifted...then the windows were cut out.
Because Tim got a generator, we were able to use power tools on site.
It is nice and time saving not having to take every board back to the house!
Many photos are listed here because of the acceleration of tasks completed.






10:08 a.m. CDT July 15, 2017

10:15 a.m. CDT July 15, 2017
getting ready to lift the walls
10:15 a.m. CDT July 15, 2017
top portion of wall moved upward
10:20 a.m. CDT July 15, 2017
10:27 a.m. CDT July 15, 2017





10:28 a.m. CDT July 15, 2017
10:28 a.m. CDT July 15, 2017
Tim's new generator from Cabela's
10:31 a.m. CDT July 15, 2017

10:52 a.m. CDT July 15, 2017
both sections of right wall lifted
11:03 a.m. CDT July 15, 2017
setting inside frame to support wall





11:04 a.m. CDT July 15, 2017
inner frame support removes buckling
11:05 a.m. CDT July 15, 2017
getting window frame install
11:10 a.m. CDT July 15, 2017
right before cutting out window
11:16 a.m. CDT July 15, 2017
Robert making first incision
11:20 a.m. CDT July 15, 2017
Tim completing cut out


11:21 a.m. CDT Saturday, July 15, 2017
USING A RECIPROCATING SAW TO CREATE
THE FIRST OPENING FOR A WINDOW








11:22 a.m. CDT July 15, 2017
Looking good with cut out!
11:27 a.m. CDT July 15, 2017

11:27 a.m. CDT July 15, 2017
Robert ensures wall is flush
11:30 a.m. CDT July 15, 2017
Oh, hello!
11:43 a.m. CDT July 15, 2017
removed left wall pieces





11:44 a.m. CDT July 15, 2017
getting ready to set window frames
11:49 a.m. CDT July 15, 2017
top of window made level
12:01 p.m. CDT July 15, 2017

12:03 p.m. CDT July 15, 2017

12:37 p.m. CDT July 15, 2017






12:39 p.m. CDT July 15, 2017

2:06 p.m. CDT July 15, 2017
cut outs done on left wall now
2:06 p.m. CDT July 15, 2017
view of left wall from inside
2:08 p.m. CDT July 15, 2017
inside view of back wall
2:10 p.m. CDT July 15, 2017





2:19 p.m. CDT July 15, 2017

2:19 p.m. CDT July 15, 2017

2:26 p.m. CDT July 15, 2017
window just cut on back wall
2:35 p.m. CDT July 15, 2017 2:35 p.m. CDT July 15, 2017






2:37 p.m. CDT July 15, 2017
getting lateral supports under eave
2:45 p.m. CDT July 15, 2017
doing left side
3:07 p.m. CDT July 15, 2017
view of completed right eave support
3:21 p.m. CDT July 15, 2017
view through right wall window
4:27 p.m. CDT July 15, 2017
View of front side, end of day

AUGUST 5, 2017

Tim and I went to the land to sight in our rifles and set up our crossbows.
(Though, my Grendel rifle had trouble, delaying crossbow work, yet again.)
Nonetheless...
We did get measurements of the blind's windows for future plexiglass.



window dimensions on
left wall:
window dimensions on
back wall (containing door):
window dimensions on
right wall:
pictured at left:
30" vertically by 29
¼" horizontally
pictured at right:
26" vertically by 27
¾" horizontally 
15" vertically by 13" horizontally 20" vertically by 26¼" horizontally


We continued work on Saturday, September 30, 2017:
August 26 was instead used to put out corn and check the trail cameras.
Instead of doing the windows, we continued work on the soffits.






9:15 a.m. CDT September 30, 2017
arrive on site at the house
9:34 a.m. CDT September 30, 2017 9:34 a.m. CDT September 30, 2017 9:46 a.m. CDT September 30, 2017 9:52 a.m. CDT September 30, 2017





10:05 a.m. CDT September 30, 2017 10:14 a.m. CDT September 30, 2017 10:21 a.m. CDT September 30, 2017 10:22 a.m. CDT September 30, 2017 10:36 a.m. CDT September 30, 2017





10:36 a.m. CDT September 30, 2017 10:51 a.m. CDT September 30, 2017 11:55 a.m. CDT September 30, 2017 12:05 p.m. CDT September 30, 2017 2:37 p.m. CDT September 30, 2017



2:37 p.m. CDT September 30, 2017

3:56 p.m. CDT September 30, 2017

4:05 p.m. CDT September 30, 2017
getting lateral supports under eave
4:49 p.m. CDT September 30, 2017

5:47 p.m. CDT September 30, 2017




6:27 p.m. CDT September 30, 2017 6:30 p.m. CDT September 30, 2017 6:43 p.m. CDT September 30, 2017 6:43 p.m. CDT September 30, 2017 6:43 p.m. CDT September 30, 2017


We continued work on Sunday, November 12, 2017:
We nearly completed work on the soffits and got all side and back windows done.
The morning was spent at Lowes in Newnan, Georgia getting plexiglass cut.
Home Depot has not done cutting of plexiglass since 2003!
It was a little cold most of the day, but we did well;
Tim and I both got windburned from being out all day.

Robert was committed and sacrificed a day of hunting to help us.




Sunday, November 12, 2017
Using a Kreg tool to created screw
holes for the window frames
Sunday, November 12, 2017
Drilling pilot holes through the
Plexiglass for fitting to frame
Sunday, November 12, 2017
Installing first window on wall of
entrance side of blind


[ Well, it took 9 months to post the last pictures; so here they are: ]
posted August 26, 2018



8:48 a.m. CST November 12, 2017

9:43 a.m. CST November 12, 2017
9:50 a.m. CST November 12, 2017
9:57 a.m. CST November 12, 2017
10:06 a.m. CST November 12, 2017


10:13 a.m. CST November 12, 2017

10:39 a.m. CST November 12, 2017

10:39 a.m. CST November 12, 2017

10:48 a.m. CST November 12, 2017

11:22 a.m. CST November 12, 2017




11:22 a.m. CST November 12, 2017

11:27 a.m. CST November 12, 2017
1:42 p.m. CST November 12, 2017

1:43 p.m. CST November 12, 2017

2:44 p.m. CST November 12, 2017



2:48 p.m. CST November 12, 2017

3:36 p.m. CST November 12, 2017

3:56 p.m. CST November 12, 2017

3:56 p.m. CST November 12, 2017

4:02 p.m. CST November 12, 2017

4:05 p.m. CST November 12, 2017
4:06 p.m. CST November 12, 2017

4:57 p.m. CST November 12, 2017

4:58 p.m. CST November 12, 2017

5:00 p.m. CST November 12, 2017

 
Tim and I are VERY GRATEFUL to Robert for his dedication to getting this work done!



Next possible date to continue work is beginning in December...
(or maybe even February of 2018)

We hope to get plexiglass and frames for the front windows instead of using the pull-down shutters.
Tim and I still need to paint the outside and we still need to complete the last bit of soffit on the front.
Insulation for the walls will have to wait as well as any protective flooring.

Note:  We were not able to continue work until August 11, 2018